supadave
12-14-2003, 04:41 PM
Ok, I just finished insulating my 3.5' concrete walls in my basement with 2" rigid foam. Pilot drilled holes and then tap-con'd the furring in the notches in the foam. Was all set for gyproc when I noticed the wall did not appear vertically level. Sure enough, the concrete wall itself is not at a 90* to the floor in places. It is more like 100* to the floor I would estimate.
My question: How can I fix this? If shimming is the answer, what material would I need to use? Or, is 10* no big deal, should I just continue as is?
Any info much appreciated, lots of details too (you're dealing with a true constuction newb here).
Thanks.
My question: How can I fix this? If shimming is the answer, what material would I need to use? Or, is 10* no big deal, should I just continue as is?
Any info much appreciated, lots of details too (you're dealing with a true constuction newb here).
Thanks.