Hello all,
I recently had a basement poured and was starting on the sub-floor. I ran into some calculation issues because my 8ft walls are 3 inches short. I can make the right adjustments, but I am wondering if such a discrepancy is normal for poured concrete walls. They did use forms. Should I complain?
Thanks,
Joe
I recently had a basement poured and was starting on the sub-floor. I ran into some calculation issues because my 8ft walls are 3 inches short. I can make the right adjustments, but I am wondering if such a discrepancy is normal for poured concrete walls. They did use forms. Should I complain?
Thanks,