pi71
12-05-2005, 07:21 PM
i have a 30x30 cabin with the plumbing allready in the foundation. what would it cost to run the final plumbing lines -drain and water supply to the bathtub,bathroom sink,toilet,fridge,dishwasher,kitchen sink. any idea.??