pomy
06-25-2003, 10:15 AM
I am using a precast wall system that require no steam wall footings on the perimiter, but on the inside support walls I have to dig footings.
the planes i have show me useing steel post with some footings 3'x3'x10.5" and others at 2'x2'x10.5" I have decided to go with a frame support wall with lumber, So my question is can i just dig one footing the entire length of wall if so what size of footings.
the planes i have show me useing steel post with some footings 3'x3'x10.5" and others at 2'x2'x10.5" I have decided to go with a frame support wall with lumber, So my question is can i just dig one footing the entire length of wall if so what size of footings.