Phil
08-01-2006, 05:14 AM
I have a story and a half framed up and did the siding myself down on the farm. There are no inspections or building codes where I am building but of course I want it done right.
While I'm trying to sell my present home I plan now to start on the inside.
What order should I do the HVAC, plumbing and wiring?
I plan on one air conditioning unit for the first floor of 2,000 sq. ft. and another unit for the second floor of about 1,000 sq. ft. to be used only when we have need of the upstairs bedrooms.
The last time I did this was 37 years ago and had a little more help. I am OK with the plumbing and wiring but worried a little about the duct work and planning on the all electric HVAC.
I will have to go from one job to the next, my question is:
Since I plan on doing all the work myself, does the HVAC have to be in before the plumbing and wiring?
While I'm trying to sell my present home I plan now to start on the inside.
What order should I do the HVAC, plumbing and wiring?
I plan on one air conditioning unit for the first floor of 2,000 sq. ft. and another unit for the second floor of about 1,000 sq. ft. to be used only when we have need of the upstairs bedrooms.
The last time I did this was 37 years ago and had a little more help. I am OK with the plumbing and wiring but worried a little about the duct work and planning on the all electric HVAC.
I will have to go from one job to the next, my question is:
Since I plan on doing all the work myself, does the HVAC have to be in before the plumbing and wiring?