tech999
11-23-2006, 10:59 AM
I need some advise here.I just added a 30 X 40 area to my 25 X75 driveway.It is made up of crush n run.I am having a 20 x 12 shed delivered and plan on putting it in the new area.
When I leveled the area I compacted it every 4 inches and then compacted the crush n run.
Now we just got between 3 to4 inches of rain in the past 2 days and the area that was resurfaced is a little soft but looks like it is settling down good
The new area is very soft I left 1 to 2 inch deep tire tracks. Should I just let it dry out and keep driving over it and rake as needed or should more stone be added?
When I leveled the area I compacted it every 4 inches and then compacted the crush n run.
Now we just got between 3 to4 inches of rain in the past 2 days and the area that was resurfaced is a little soft but looks like it is settling down good
The new area is very soft I left 1 to 2 inch deep tire tracks. Should I just let it dry out and keep driving over it and rake as needed or should more stone be added?