fineedgedesign
02-25-2007, 04:25 PM
Getting ready to build a set of very expensive steps leading into rear yard at new clients house. Picture 8 1/2' of grade over 26- 28'.
After 16', the grade drops off very quickly; 2 1/2' - 3' . I'm going to form these steps out of concrete, add several sets of piers and incorporate rebar all over this thing. I plan on using a pump to do this because of the terrible access.
Also going to incorporate 2 side walls that will follow the steps to the bottom.
All of this is gonna to be covered with natural stone.
Anybody here ever build a large set of steps and is there anything that you had to be careful of or would do differently?
After 16', the grade drops off very quickly; 2 1/2' - 3' . I'm going to form these steps out of concrete, add several sets of piers and incorporate rebar all over this thing. I plan on using a pump to do this because of the terrible access.
Also going to incorporate 2 side walls that will follow the steps to the bottom.
All of this is gonna to be covered with natural stone.
Anybody here ever build a large set of steps and is there anything that you had to be careful of or would do differently?