hovrens
04-18-2004, 09:24 PM
I have already got my plans approved by the city building and safety for a 365 sqft room addition. The architect designed it with plywood sheathing which I understand just went up big in $. The existing structure is already sheathed with OSB. Does a change to osb need to go through architect and city plans check? I am getting ready to frame it and do not need a hassle. What if I was to just use OSB. Could the inspector not sign me off and make me re-sheath in plywood as the plans show?