richard griggs
05-07-2004, 06:39 PM
Hi,i'am about to pour my first footing what should i prepair my 2by 10 and my keyway with so that the concrete won't stick to them thanks Richard Griggs

Rich
05-07-2004, 08:10 PM
I've never worried about the 2x10 formwork sticking to the concrete. The longer you wait to strip the worse you will be - but I usually strip within a day or 2 at most - so I've never had a problem with it.
For the keyway you can grease it or use some type of wrap (reynolds wrap?). I've used 2" rigid foam for keyways before - it works really good.