wantsusa
06-22-2008, 09:50 AM
Due to the masonry above, the pier would be hard to remove (especially since the grade beams are so damaged), anyone have an idea of how to create a fix in this situation?
All I can think of is enlarging the footing around and drilling through the pier and enlarging the entire column with a large enough lip to rebuild the grade beams as well.
Thanks
All I can think of is enlarging the footing around and drilling through the pier and enlarging the entire column with a large enough lip to rebuild the grade beams as well.
Thanks